3265 Uppsatser om Production Improvement - Sida 1 av 218

En modell för att kostnadseffektivt öka produktionen inom aluminium-bearbetning

The purpose of this study is from a case study develop a model that aims to cost effectively improve productivity in a manufacturing production process. The study highlights the importance of having knowledge about customer needs and using a holistic process perspective when improving productivity to identify the relations between the process stations and by this find problems that cause waste and losses in productivity. Tools and methods used to make production more efficient such as single minute exchange of die, spaghetti diagram, 5s and master production schedule is presented an applied in the model to see how these effect costs, productivity etc.Maintenance effects on quality and productivity in a manufacturing company will as well be covered in this thesis. The results and conclusions finally reveals how the process improvement tools, maintenance and production planning for example effects each other and why it is important to establish an attitude in the company where continuous process improvement should be emphasized..

Värdeflödesanalys och förbättringsförslag på Pallco AB : Value stream mapping and improvement proposal at Pallco AB

This report is a study made at Pallco AB. Pallco is a subcontractor that is specialized on steel and aluminium components.The aim of the report is to show an improvement proposal that leads to a reduction of the storage and improve the flow through the production of one item that is a part of a product that Pallco manufactures.With the increasing competition from other countries who can manufacture with lower costs must Swedish companies try to make theirs manufacturing as efficient as possible and remove all waste. By using the tools of Lean Production it is possible to reduce the costs and increase the efficiency.The method we used is value stream mapping. A map of the present condition has been made and then different improvement proposal were discussed. A map of a future condition has also been designed..

Information ochmaterialflödesförbättrings analys

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Förslag till energieffektivisering och energideklarationsunderlag : Munkebergsskolan och Bredängens äldreboende i Luleå

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Produktivitetsstudie Brobyggnad

The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented.

High Orbit Ion Cannon : Går det att skydda sig?

The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented.

Optimering av monteringsavdelningen förfjädergunglekar : Med Lean mot kundorderstyrd montering

If Sweden want to be able to compete internationally with its production capacity,it is important to work actively with production development and production ofresource-and time-efficient. This report is a bachelor thesis of 15 hp conducted atthe University of Halmstad. Using the principles of continuous improvement andLean Production, the author developed a concept for HAGS Aneby AB to changeto the customer order driven assembly of spring toys.First of all, the theories of Lean Production, logistics and ergonomics are used tobuild and present a theoretical framework for further examination. Then, toachieve the target, the current assembly process is analyzed to develop some firstconceptual ideas for improvement. In order to develop the best advice, theconcepts are evaluated against the company?s requirementsThe developed action plan gives recommendations on how the company shouldrestructure their assembly process and the organization of the related departmentin order to produce spring toys in a more time efficient and lean way.

En rörig historia : en fallstudie över Secorocs processflöde av DTH-rör

Abstract Title: A messy story ? a case study of Secorocs process flow of DTH-pipes Presentation date: 2010-06-02 Course: Bachelor thesis in businessAuthor: Kristoffer ForsmanAdvisor: Kjell GustafssonKeywords: Management control, process control, lean production, process flow analysisPurpose: The purpose of this bachelor thesis is to develop an overview of the process flow for a specific product, and with the help of this mapping based on a lean production philosophy show possible improvement proposals and how these can lead to a more efficient process flow.Methodology: I have used a case study of Secorocs DTH-pipes and my primary data are gathered through interviews and observations. I have used theoretical framework to establish a process flow analysis. This is to obtain data on process activities and whether they are creating value or not. This leads to a current mapping of the situation in Secoroc on DTH-pipes and then analyzed and suggestions for improvement are developed.Conclusions: That by using the above mentioned mapping of process flow of DTH-pipes, problem areas could be illustrated.

Utveckling av Materialförsörjning : En studie av Sandvik Coromants försörjning av stål

This report is a master thesis performed by Adam Lundin at the company Sandvik Coromants production facility in Gimo. The work started in January 2013 and went on for the duration of 20 weeks, which is equivalent to 30 hp. The project was executed at the department GVR10. The scope of the project was to create a base for improvements in the purchasing process of direct material to the production. The background to the project was that the centralized purchasing department has gone through changes and decision was taken to decentralize the purchasing of direct material to Gimo.

EFFEKTIVISERING AV INTERN MATERIALHANTERING

Considering that the current technology is constantly improving, it becomes increasingly important to have an efficient logistics in a company to maintain profitability while achieving a competitive business. Efficient logistics may be accomplished by improving the internal materials handling. In this thesis the internal material handling of steel frames has been studied at a factory in Vaggeryd. The goal of this study is to investigate the problems that exist with the current production flow of products and provide suggestions on how it can be developed to reduce unnecessary handling and movement.The study has a deductive approach where the authors has been using literature studies parallel with empirical analyzes conducted at a company to achieve the purpose of the study. Documentation from the company and interviews with staff and observations form the basis for the data collection carried out.

Implementering av Lean genom TAK och SMED

This graduation work is a result of implementing Lean Production using OEE and SMED at Enics Sweden AB in Malmö. Enics doesn?t have an established improvement concept and therefore should this work serve as an introduction to possibly start with Lean Production. A result in this report is that an OEE value has been identified within a common order at Enics. Other results are that an implementation of a Lean-board has been implemented and furthermore, within SMED, a flag that indicates changeover..

Adaptive Capacity through Complex Adaptive System

Problem: The corrugated board industry is highly affected by customer uncertainty, various demands and short delivery times. In combination with a complex multi-step production process managers have to be able to identify bottle-necks and gain knowledge and understanding of how different changes in process will affect the production output. <br/><br/>Purpose: The purpose of this master thesis is twofold, (1) to examine applicability of complexity theory through agent-based modelling on a production process (2) to identify improvement areas in order to increase the production output at SKS production site in Eslöv, by modelling and simulating the production process through an agent-based model. <br/><br/>Method: The chosen method of this study is a combination of a case study and a complex system approach. The empirical data was collected through interviews, observation and document studies which were analysed through an agent-based simulation model.

Utveckling av produktionslina

The company is currently in a stage of improvement and has therefore taken the help of students at School of Engineering, Jonkoping University. The current production is batch, production layout is fixed. A bottleneck is created after the first station which leads to large efficiency loss.  The meaning of this report was to provide a layout suggestion with balanced workstations to a new production line. The conditions were that the production line would be one-way, driven by customers order and meet a demand of 40 products per week.

Förståelsen för OK>1

In 2005, Outokumpu began to implement its system of continuous improvement, OK> 1, at Avesta Jernverk. OK> 1 has not generated sufficient results on plant KPI:s. The purpose of this study is to identify the understanding,  participation and commitment regarding to OK> 1, and to suggest some actions to make OK> 1 more successful with emphasis on these three aspects. The thesis shall also determine whether there are any differences in the attitude towards OK>1 between Blue Collars and White Collars.The study consisted of a survey, and interviews. The output from these methods were processed and analyzed and finally resulted in a SWOT ? analysis and suggested actions for improving the understanding, participation and commitment towards OK>1.

Value stream mapping i praktiken : En fallstudie på Light My Fire

Titel: Value stream mapping in practice ? A case study at Light MyFireAuthors: David Rydman and Tomas ÖnnemarMentor: Veronica Ülgen SvenssonExaminer: Åsa GustafssonBackground: Companies push their prices in today's markets to be competitive, which means that companies need to find ways to reduce costs while maintaining profits. (Cudney, 2009) According to Bergman and Klefsjö 2007, the basic rule of quality improvement says "there is always a way to achieve higher quality at a lower cost". One way is to improve a company's processes to get a more efficient flow and improvements that may cut costs. (Bergman & Klefsjö, 2007) Why it's important to look at the processes are that they often contain waste that can be eliminated.